Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Badger, W W and Mulligan, D E (1995) Rationale and Benefits Associated with International Alliances. Journal of Construction Engineering and Management, 121(01), 100–11.

Basha, I M, Gab-Allah, A A and Amer, M I (1995) Construction of Ameria Caisson in Egypt. Journal of Construction Engineering and Management, 121(01), 13–19.

Boles, W W, Maxwell, D A, Scott, W D, Heermann, P D, Yarborough, T and Underwood, J (1995) Construction Automation and Robotics—Pathway to Implementation. Journal of Construction Engineering and Management, 121(01), 143–52.

Chao, L and Skibniewski, M J (1995) Neural Network Method of Estimating Construction Technology Acceptability. Journal of Construction Engineering and Management, 121(01), 130–42.

Christian, J and Hachey, D (1995) Effects of Delay Times on Production Rates in Construction. Journal of Construction Engineering and Management, 121(01), 20–26.

Everett, J G and Thompson, W S (1995) Experience Modification Rating for Workers' Compensation Insurance. Journal of Construction Engineering and Management, 121(01), 66–79.

Fisher, D J, O'Neill, M W and Contreras, J C (1995) DS^2: Drilled Shaft Decision Support System. Journal of Construction Engineering and Management, 121(01), 86–94.

Garsden, B R (1995) Postconstruction Evaluation. Journal of Construction Engineering and Management, 121(01), 37–42.

Jaraiedi, M, Plummer, R W and Aber, M S (1995) Incentive/Disincentive Guidelines for Highway Construction Contracts. Journal of Construction Engineering and Management, 121(01), 112–20.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1995)121:1(112)
  • Abstract:
    Contract incentives have traditionally been used as a means of aligning the goals of the contracting agency with those of the contractor. One area in which contract incentives are used is highway construction and refurbishing. The use of incentives and disincentives (I/Ds) for project completion time has helped highway agencies in various states to reduce construction time significantly. However, I/D provisions increase costs to the contracting agency, and should therefore be used sparingly. For these types of contracts to succeed, it is necessary for the contracting agency to be extremely careful in the development, documentation, and execution of I/D clauses. In this research, the current use of I/D contracts in many states and the experience of several contractors were examined. Then, a general set of guidelines was developed for the use of I/D provisions in highway construction or refurbishing contracts. The guidelines aid in determining which projects should contain the I/D provisions and how to structure the I/D provisions to achieve maximum success.

Kibert, C J and Coble, R J (1995) Integrating Safety and Environmental Regulation of Construction Industry. Journal of Construction Engineering and Management, 121(01), 95–99.

Maloney, W F and McFillen, J M (1995) Job Characteristics: Union-Nonunion Differences. Journal of Construction Engineering and Management, 121(01), 43–54.

Mayo, R E and Liu, G (1995) Reform Agenda of Chinese Construction Industry. Journal of Construction Engineering and Management, 121(01), 80–85.

Navon, R (1995) Economic Benefits of Lightweight versus Conventional Construction Methods. Journal of Construction Engineering and Management, 121(01), 27–36.

Thomas, H R, Smith, G R and Cummings, D J (1995) Have I Reached Substantial Completion?. Journal of Construction Engineering and Management, 121(01), 121–9.

Thomas, H R, Smith, G R and Wirsching, S M (1995) Understanding Defective Specifications. Journal of Construction Engineering and Management, 121(01), 55–65.

Varghese, K and O'Connor, J T (1995) Routing Large Vehicles on Industrial Construction Sites. Journal of Construction Engineering and Management, 121(01), 1–12.